Q2 Metals Drills 120.3 M at 1.72% Li2O including 19.0 M at 2.06% in First Assays Reported from its Spring 2024 Drill Campaign at the Cisco Lithium Property, James Bay, Quebec, Canada

Highlights:Strong analytical results from the inaugural drilling campaign for Q2 Metals including:CS-24-010: Cumulatively 181.1 metres ("m") at 1.67% Li2OWidest interval of 120.3 m at 1.72% Li2O including 19.0 m at 2.06% Li2OCS-24-007: Cumulatively 94.6 m at 1.52% Li2OWidest interval of 27.1 m at 1.96% Li2O including 11.1 m at 2.49%…